19A NCAC 02D .0807      EXAMINATION OF PLANS: SPECS: CONTRACT: AND SITE OF WORK

A bidder shall examine the site of the work contemplated, the plans and specifications, and the proposal therefor.  A bidder or contractor shall make such independent investigation and examination as he deems necessary to satisfy himself as to conditions to be encountered in the performance of the work and with respect to possible local material sources, the quality and quantity of material available from such property, and the type and extent of processing that may be required in order to produce material conforming to the requirements of the contract.  Upon submission of the bid, the Department shall deem that the bidder has completed the requirements set out in the bid documents as to the conditions to be encountered, the character, quality, and scope of work to be performed, the quantities of materials to be furnished and as to the conditions and requirements of the proposal and plans under which his bid is offered.

 

History Note:        Authority G.S. 136‑18(1); 136‑28.1;

Eff. April 3, 1981;

Temporary Amendment Eff. March 15, 1982, for a period of 47 days to expire on May 1, 1982;

Amended Eff. February 1, 2008; October 1, 1993; March 1, 1984; May 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. September 6, 2016.